EasyManua.ls Logo

GE AKTApure - Page 165

GE AKTApure
522 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
In the Process Picture:4
Click on the buffer inlets.
Select the position of one of the inlets that will be used at the beginning of the run.
Result: The inlet valve switches to the selected port.
In the Process Picture:5
Click on the Pumps.
Set the System flow to 1.0 ml/min for ÄKTA pure 25 or 10.0 ml/min for ÄKTA pure 150.
Click Set flow rate.
Result: A system flow starts.
Connect a 25 to 30 ml syringe to the purge valve of the left pump head of System pump
B. Make sure that the syringe fits tightly into the purge connector.
6
Open the purge valve by turning it counter-clockwise about three quarters of a turn.
Draw a small volume of liquid slowly into the syringe (with a rate of about 1 ml per second).
7
Close the purge valve by turning it clockwise. Disconnect the syringe and discard its
contents.
8
ÄKTA pure User Manual 29119969 AB 165
5 Operation
5.4 Prime inlets and purge pump heads
5.4.1 System pumps

Table of Contents

Related product manuals