EasyManua.ls Logo

GE AKTApure - Page 167

GE AKTApure
522 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Purge System pump A
Purge both pump heads of System pump A by following the same procedure as in Purge System pump
B, on page 163, but replace step 3 with the following actions:
In the Process Picture:
Click on the pumps.
Set Conc % B to 0% B.
Click Set % B
Result: Only System pump A is active.
Validate purge of pump A
Follow the procedure described in Validate purge of pump B, on page 166 to check if there is air left in
the pump.
End the run
Click the End button in the System Control toolbar to end the run.
ÄKTA pure User Manual 29119969 AB 167
5 Operation
5.4 Prime inlets and purge pump heads
5.4.1 System pumps

Table of Contents

Related product manuals