EasyManua.ls Logo

GE AKTApure - Page 280

GE AKTApure
522 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
In the Phase Properties tab of each of the System CIP phases:4
Enter a note for the first solution (optional).
Select values for Flow rate, Volume per position and Incubation time.
Define the extent of cleaning by checking the check boxes.
Note:
For complete cleaning of the Injection valve, select at least one of the sample inlets and
clean the manual injection port using a syringe (see Clean the manual injection port of
the Injection valve, on page 282).
Note:
The pH electrode and the pH valve are not included in the system CIP. Refer to Sec-
tion 7.6.7 Clean the pH electrode, on page 293 for instructions on how to clean the pH
electrode.
If the fraction collector is included, a lower flow rate might need to be set in the instruc-
tion Fraction collector wash settings.
Make sure not to exceed the pressure limits for any of the modules that are part of the
flow path during the CIP.
280 ÄKTA pure User Manual 29119969 AB
7 Maintenance
7.6 Maintenance when required
7.6.2 Perform System CIP

Table of Contents

Related product manuals