GE MEDICAL SYSTEMS
D
IRECTION 2380207, REVISION 7 LOGIQ™ 5 PRO SERVICE MANUAL
Chapter 8 Replacement Procedures 8 - 59
8-5-10-4 Removal Procedure (cont’d)
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-5-10-5 Mounting procedure
Install the new parts in the reverse order of removal.
Table 8-29 Functional Tests
Service Manual
Section Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
2380207, Rev 7+, Section 8-5-10.
Equipment passed all required tests and is
ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-12-1
Cover Parts Function Validation
Section 10-5-5
Physical Inspection