EasyManua.ls Logo

GE LOGIQ 5 PRO - Section 4-3 General Procedure

GE LOGIQ 5 PRO
462 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
DIRECTION 2380207, REVISION 7 LOGIQ™ 5 PRO SERVICE MANUAL
4 - 2 Section 4-3 - General Procedure
Section 4-3
General Procedure
4-3-1 Power On/Boot Up
NOTE: After turning off the system, wait at least ten seconds before turning it on again. The system
may not be able to boot if power is recycled too quickly.
4-3-1-1 Scanner Power On
1.) Connect the Main Power Cable to the back of the System.
2.) Ensure the Cable Clip slips securely over the shoulders on the molded plug.
3.) Connect the Main Power cable to an appropriate mains power outlet.
4.) Switch ON the Main Circuit Breaker at the rear of the System.
CAUTION
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place. The
covers are required for safe operation, good system performance and cooling purposes.
NOTICE
Lockout/Tagout Requirements (For USA only)
Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the Power Cable
on the system.
Signed
Date
TA G
&
LOCKOUT

Table of Contents