EasyManua.ls Logo

GE LOGIQ 5 PRO - LV Unit (FRU No. 701)

GE LOGIQ 5 PRO
462 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
DIRECTION 2380207, REVISION 7 LOGIQ™ 5 PRO SERVICE MANUAL
8 - 156 Section 8-9 - Power Block
8-9-2 LV Unit (FRU No. 701)
Purpose: This is a description on how to remove and replace the LV Unit.
8-9-2-1 Tools
• Common pillips screwdrivers
• Allen/Unbraco wrench
• Long-nose gripper
8-9-2-2 Needed Manpower
• 1 person, 15 minutes + travel
8-9-2-3 Preparations
• Shut Down the System and switch off the Main Breaker at the rear as described in section 4-3-2 on
page 4.
8-9-2-4 Removal Procedure
NOTE: LV Unit can be removed without disassembling AC Power Assy.
1.) Unscrew four (4) screws (1-4) to remove Left side cover of AC Power assy.
2.) Disconnect three (3) connectors (5-7) from the rear side of the LV Unit. Refer to Figure 8-174.
3.) Unscrew four (4) screws (8-11) to remove Right side cover of AC Power assy.
CAUTION
Do not wear the ESD wrist strap when you remove a part of power supply unit. Turn OFF power
and unplug the power cord before removing a part of power supply unit. However be sure to turn
off power and wear the strap before you remove a circuit boards.
Figure 8-174 Disconnect 3 connectors
(5)
(6)
(7)
LEFT SIDE VIEW

Table of Contents