EasyManua.ls Logo

GE LOGIQ 5 PRO - Receiving and Unpacking the Equipment

GE LOGIQ 5 PRO
462 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
DIRECTION 2380207, REVISION 7 LOGIQ™ 5 PRO SERVICE MANUAL
3 - 4 Section 3-3 - Receiving and Unpacking the Equipment
Section 3-3
Receiving and Unpacking the Equipment
When a new system arrives, check that any components are not damaged and are not in short supply.
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
1.) Cut the three PLASTIC BANDs.
Figure 3-7 Cutting the Plastic Bands.
CAUTION
Do not lift the unit by the Keyboard. Equipment damage may result.
CAUTION
The crate with the LOGIQ™ 5 PRO weighs approximately 180 kg. (397 lb.) Be prepared for a
sudden shift of weight as the unit is removed from its base (pallet)
Plastic Bands

Table of Contents