EasyManuals Logo

GE LOGIQ E10 Service Manual

GE LOGIQ E10
778 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #344 background imageLoading...
Page #344 background image
DIRECTION 5750007-1EN, REV. 1 LOGIQ E10 BASIC SERVICE MANUAL
8 - 98 Section 8-7 - Replacing Top Console Parts
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
Table 8-109 Main Monitor Arm assembly replacement Functional Checks
See
Section
Functional Check Debrief Script
4-2-3 Power ON/Boot Up
LOGIQ E10 Basic Service Manual, Direction
5750007-1EN, Rev. 1. Leakage Current
measured at (record the value) and meets
allowable limits. Equipment passed all required
checks and is ready for use.
4-2-5 Main Monitor Positions and Lock
4-2-5 Operator I/O Movement - Main Monitor
4-2-7 B-Mode Checks
4-2-7 System CFM and PWD Checks
10-7-4 Grounding continuity
10-7-5 Chassis leakage current test
4-2-4 Power SHUT DOWN

Table of Contents

Other manuals for GE LOGIQ E10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ E10 and is the answer not in the manual?

GE LOGIQ E10 Specifications

General IconGeneral
TouchscreenYes
3D/4D ImagingYes
ApplicationsVascular, Cardiac, Musculoskeletal, OB/GYN
Image StorageUSB, Network
ConnectivityDICOM, Ethernet, Wireless

Related product manuals