GE COMPANY
DIRECTION 5472001-1EN, REVISION 6OPTIMA CT680 SERIES AND OPTIMA CT670 INSTALLATION MANUAL
Page 194 Appendix C - Operating Table Installation and Adjustment
3.) Prepare crossbar and two beams.
Figure C-2 Cross and Beams
4.) Install the upper crossbar by screwing seven screws, three screws for tabletop, four screws for
left and right legs.
Figure C-3 Crossbar Installation