EasyManua.ls Logo

GE Voluson P8 BT16 - Section 8-26 Replacement of the SPEAKER

GE Voluson P8 BT16
612 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE DRAFT VOLUSON™ P8 / VOLUSON™ P6
DIRECTION 5723243, R
EVISION 6 DRAFT (MAY 23, 2018) BASIC SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-91
Section 8-26
Replacement of the SPEAKER
8-26-1 Manpower
One person, 30 minutes
8-26-2 Tools
Philips screwdriver
8-26-3 Preparations
1.) Power Off/Shutdown the system as described in 4-3-2 on page 4-4.
8-26-4 Removal Procedure
1.) Remove the MAIN OPIO and SUB OPIO. Refer to the Section 8-25 on page 8-87 OPIO.
2.) Disconnect the 2 SPEAKER CONNECTORS. Refer to the figure below.
3.) Unscrew each 3 screws of SPEAKER ASSY L, R and remove. Refer to the figure below.
8-26-5 Installation Procedure
1.) Install the new parts in the reverse order of removal.
2.) Perform: FRU8-11: Replacement of the SPEAKER - Functional Tests.
Figure 8-136 Disconnecting SPEAKER CONNECTOR
Figure 8-137 Unscrewing 6 screws to separate SPEAKER ASSY

Table of Contents

Related product manuals