EasyManua.ls Logo

GE Voluson P8 BT16 - 8-58-5 Installation Procedure

GE Voluson P8 BT16
612 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE DRAFT VOLUSON™ P8 / VOLUSON™ P6
DIRECTION 5723243, R
EVISION 6 DRAFT (MAY 23, 2018) BASIC SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-185
3.) Disconnect Battery power and signal cables.
4.) Open cover and replace Battery pack from DPS with Battery top cover.
8-58-5 Installation Procedure
1.) Install the new parts in the reverse order of removal.
2.) Perform: FRU8-50: Replacement of Battery Pack Assy - Functional Tests.
NOTE: When the AC power is plugged in, the system fan will be operated automatically until the battery is fully
chaged. Even though the AC power is plugged in with the full battery, the system fan will also be
operated automatically for less than one minute.
Figure 8-261 Disassembling Battery power and signal cables from DPS with Battery board
Figure 8-262 Unscrewing 3 screws and replacing Battery pack from DPS with Battery top cover

Table of Contents

Related product manuals