EasyManua.ls Logo

GE Voluson P8 BT16 - Page 545

GE Voluson P8 BT16
612 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE DRAFT VOLUSON™ P8 / VOLUSON™ P6
DIRECTION 5723243, R
EVISION 6 DRAFT (MAY 23, 2018) BASIC SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-197
FRU8-49: Replacement of ECG Kit assy
FRU8-50: Replacement of Battery Pack Assy
FRU8-52: Replacement of Battery
See Section
Functional and/or
Leakage Current Test Debrief Script
10-8-5
Enclosure Leakage Current Test Proprietary Service Manual,
Voluson™ P8 / Voluson™ P6,
Revision 6, Section 8-57
Equipment passed all required
tests and is ready for use.
4-7
Peripheral Checks
See Section
Functional and/or
Leakage Current Test
Debrief Script
4-3-1
Power On / Boot Up
Proprietary Service Manual,
Voluson™ P8 / Voluson™ P6,
Revision 6, Section 8-58
Equipment passed all required
tests and is ready for use.
N/A
Wait for 30 minutes to charge battery
N/A
Disconnect Circuit Breaker of AC powerPIR
Table 8-2
System Function
4-3-2
Power Off / Shutdown
See Section
Functional and/or
Leakage Current Test
Debrief Script
4-3-1
Power On / Boot Up
Proprietary Service Manual,
Voluson™ P8 / Voluson™ P6,
Revision 6, Section 8-59
Equipment passed all required
tests and is ready for use.
N/A
Wait for 30 minutes to charge battery
N/A
Disconnect Circuit Breaker of AC powerPIR
Table 8-2
System Function
4-3-2
Power Off / Shutdown

Table of Contents

Related product manuals