EasyManua.ls Logo

GE Voluson P8 BT16 - Section 8-48 Replacement of the CBP

GE Voluson P8 BT16
612 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE DRAFT VOLUSON™ P8 / VOLUSON™ P6
DIRECTION 5723243, R
EVISION 6 DRAFT (MAY 23, 2018) BASIC SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-149
Section 8-48
Replacement of the CBP
8-48-1 Manpower
One person, 30 minutes
8-48-2 Tools
Philips screwdriver, Allen Wrench
8-48-3 Preparations
1.) Power Off/Shutdown the system as described in 4-3-2 on page 4-4.
2.) Pull out the NEST as described in Section 8-28 "Replacement of the NEST" on page 8-93.
8-48-4 Removal Procedure
1.) Remove the CSI. Refer to Section 8-47 "Replacement of the CSI" on page 8-147
2.) Remove fan connector and unscrew 8 screws.
Figure 8-211 Removing fan connector and unscrewing 8 screws

Table of Contents

Related product manuals