Chapter 5 Installaon
Before You Start
• Make sure that the device in the package is in good
condion and all the assembly parts are
included.
• Make sure that the wall is strong enough to withstand three
mes the weight of the device.
Steps
1. Install 120 gang box into the wall.
Figure 5-1 Install Gang Box
2. Route the cables through the cable hole of the mounng plate.
3. Secure the device mounng plate on the gang box with 2 screws (supplied).
Figure 5-2 Install Mounng Plate
4. Wire the corresponding cables.
5. Align the device with mounng plate. Push the terminal in the mounng plate from boom up.
Fasten the terminal with the buckles on the plate.
DS-K1T804B Series Fingerprint Access Control Terminal User Manual
10