123 
●  Keep a space of 20 mm in the upper direction of the Slide base for the stable installation state of the 
Cleaning Station. 
 
 
 
(2)  Fix the Slide base with the supplied M4 screws (4 pieces). 
●  Fix the Slide base at a sturdy location which can withstand a load of 7 kg.   
(maximum load of the Cleaning Station: 7 kg) 
 
 
 
●  If you do not use the supplied M4 screws, use M4 screws (6 mm or more in length) whose screw head 
protrudes from the screw mounting part of the Slide base and does not interfere with the slide block.