EasyManua.ls Logo

Hologic Faxitron CT - Preventive Maintenance Schedules

Hologic Faxitron CT
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Faxitron CT Specimen Radiography System User Guide
Chapter 8: Maintenance, Cleaning, and Disinfecting
5081-9544 Revision 004 Page 85
8.2.2 Power Cord
How to Inspect the Power Cord
1. Once every quarter, visually inspect the power cord for cuts, damage to the cover, or
strain relief.
2. If the power cord appears damaged, contact Hologic for replacement of the power
cord.
8.3 Maintenance
8.3.1 Preventive Maintenance Schedules
Table 2: User Preventive Maintenance
Action Daily Quarterly
As
Required
Perform Image Calibration
Perform Geometric Calibration
Perform Uniformity Calibration
Clean and disinfect the Imaging Cabinet chamber
Clean and disinfect the cabinet door handle
Clean and disinfect the control display surface
Table 3: Service Preventive Maintenance
Action Annually
Semi-
Annually
As Needed
X-ray Tube Conditioning Note 1
Operational/Safety Checks
Perform kV Verification
Image Quality Checks
Check and Adjust Low Voltage Power Supply
Perform Radiographic Survey

Table of Contents

Other manuals for Hologic Faxitron CT

Related product manuals