EasyManua.ls Logo

Honeywell UDC2300 - Input 2 Calibration Procedure

Honeywell UDC2300
185 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Input Calibration
92 UDC2300 Controller Product Manual 12/00
0 to 2 Volts, 0 to 5 Volts, or 1 to 5 Volt Inputs
Use the copper leads and connect the calibrator to the rear terminals of Input #2
(see Figure 8-8).
Make sure the jumper of S201 is set for Volts (position 2).
See Figure 2-2 Jumper Placements.
24879
15
16
+
_
1 to 5 Volt
Source
+
_
Copper
Leads
0 2 Volts
0 5 Volts
Figure 8-8 Wiring Connections for 1 to 5 Volt Input Input 2
8.7 Input 2 Calibration Procedure
Preliminary Steps
Apply power and allow the controller to warm up for 30 minutes before you calibrate.
Please read Subsection 8.6 Input 2 Set Up Wiring before beginning the procedure.
Make sure you have LOCK set to NONE. See Subsection 4.5 - Tuning Set Up
Group.
Continued next page

Table of Contents

Other manuals for Honeywell UDC2300

Related product manuals