Figure 7-49 Installing a PCIe card on the mainboard
Step 5 Close the latch. See step (2) in Figure 7-49.
Step 6 Install the chassis cover. For details, see 7.12 Installing the Chassis Cover.
Step 7 Install the 5288 V3. For details, see 3.4 Installing the Server.
Step 8 Connect all internal cables such as power and network cables. For details, see 3.5 Connecting
External Cables.
Step 9 Power on the 5288 V3. For details, see 4.1 Powering On the Server.
----End
7.23 Removing the TPM
Remove a trusted platform module (TPM) before replacing it with a new one.
Procedure
Step 1 Wear an ESD wrist strap. For details, see 1 Safety Instructions.
Step 2 Determine the rack number and chassis number of the server to be removed, and label its
panel to prevent misoperations.
Step 3 Power off the 5288 V3. For details, see 4.2 Powering Off the Server.
Step 4 Remove all external cables such as power and network cables.
5288 V3 Server
User Guide
7 Replacing Parts
Issue 26 (2018-11-19) Copyright © Huawei Technologies Co., Ltd. 163