Figure 3-15 Installing a server on holding rails
NOTE
– Ensure that the inner rail is clipped into the middle rail, and then slowly push the chassis inside
until you hear a click, as shown in (1) in Figure 3-16.
– If the inner rail is not clipped into the middle rail, the rolling balls and the holding rail may be
damaged as shown in (2) and (3) in Figure 3-16.
Figure 3-16 Clipping the inner rail into the middle rail
5. Press the release buttons on both sides, and push the server into the cabinet until the
server cannot move forward. See Figure 3-17.
5288 V3 Server
User Guide
3 Installing and Removing the 5288 V3
Issue 26 (2018-11-19) Copyright © Huawei Technologies Co., Ltd. 66