Step 3 Connect a network cable, a VGA cable, or USB devices as required, and connect power
cables.
Step 4 (Optional) Install the cable management arm (CMA).
1. Slot left outer arm of the support lever between the protrusions of the left outer rail. See
step (1) in Figure 3-19.
Figure 3-19 Installing the CMA
2. Slot the right outer arm of the CMA between the protrusions of the right outer rail. See
step (2) in Figure 3-19.
3. Slot the right inner arm of the CMA between the protrusions of the right inner rail. See
step (3) in Figure 3-19.
Step 5 (Optional) If a CMA is installed, the external cables connected to the server must be routed
into the CMA. See Figure 3-20.
5288 V3 Server
User Guide
3 Installing and Removing the 5288 V3
Issue 26 (2018-11-19) Copyright © Huawei Technologies Co., Ltd. 68