Manager software for problem determination. In the case of an uncertified
drive, ensure that the drive options or drive FRU part number is correct for
the storage subsystem.
8. Use the Storage Manager software to monitor the status of the new drive and
the progress of the data reconstruction. Wait for data reconstruction to finish
(the drive activity LED stops flashing).
Note: The drive activity LED continues to flash after reconstruction is finished
if there is I/O activity to that drive. In that case, use the host software to
determine whether the data reconstruction is finished.
9. When reconstruction is finished on the new drive, repeat step 5 on page 131
through step 8 for each additional drive that you want to install.
10. Use the Storage Manager software to configure the additional space on the
new drives.
Replacing an ac power supply
(L003)
1
2
or
!
1
2
The power supplies are customer replaceable units (CRUs) and do not require
preventive maintenance. Use only the supported power supplies for the storage
subsystem.
132 IBM System Storage DS3500 and EXP3500 Storage Subsystem: Installation, User's, and Maintenance Guide