EasyManuals Logo

IBM SAN192C-6 User Manual

IBM SAN192C-6
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #78 background imageLoading...
Page #78 background image
Removing the Shelf Bracket Kit
About this task
The shelf bracket kit can be removed after the IBM c-type SAN director switch has been installed in a
two-post telco (only SAN192C-6 Director) or four-post EIA rack, and the front rack-mount brackets are
securely attached to the rack-mounting rails. For additional support in an EIA rack, ensure that the C
brackets on the SAN384C-6 Switch are attached to the rear rack-mounting rails.
Use this procedure to remove the shelf bracket kit.
Procedure
1. Remove the screws fastening the slider brackets to the rear rack-mounting rails. Then slide the slider
brackets out of the shelf brackets.
2. Remove the screws fastening the crossbar to the shelf brackets and remove the crossbar.
3. Remove the screws fastening the shelf brackets to the front rack-mounting rails. Then remove the
shelf brackets from the rack.
52IBM Storage Networking SAN192C-6, SAN384C-6 and SAN768C-6: SAN192C-6, SAN384C-6 and
SAN768C-6 Installation, Service, and User Guide

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM SAN192C-6 and is the answer not in the manual?

IBM SAN192C-6 Specifications

General IconGeneral
BrandIBM
ModelSAN192C-6
CategoryStorage
LanguageEnglish

Related product manuals