EasyManuals Logo

IBM SAN192C-6 User Manual

IBM SAN192C-6
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #80 background imageLoading...
Page #80 background image
Unpacking and Inspecting the Switch
Before you install a new chassis, you need to unpack and inspect it to be sure that you have all the items
that you ordered and verify that the switch was not damaged during shipment. If anything is damaged or
missing, contact your customer representative immediately.
About this task
CAUTION: We recommend that you use a mechanical lift when the chassis is being moved or
lifted. Fully loaded, SAN192C-6 chassis can weigh up to 325 lb (147.5 kg), SAN384C-6 chassis can
weigh up to 449.5 lb (203.8 kg), and SAN768C-6 chassis can weigh up to 923 lb (419 kg).
CAUTION: When handling switch components, wear an ESD strap and handle modules by the
carrier edges only. An ESD socket is provided on the chassis. For the ESD socket to be effective, the
chassis must be grounded either through the power cable, the chassis ground, or metal-to-metal
contact with a grounded rack.
Tip: Keep the shipping container for use when moving or shipping the chassis in the future. The shipping
carton can be flattened and stored with the pallet.
Note: The switch was thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, contact your customer service representative immediately.
To inspect the shipment, follow these steps:
Procedure
Compare the shipment to the equipment list provided by your customer service representative and
ensure that you have received all items, including the following:
1 or 2 supervisor modules
1 to 4, 8, or 16 switching modules depending on the IBM c-type SAN Device
Up to six crossbar fabric modules
3 fan modules
1 to 4, 8, or 16 power supplies depending on the IBM c-type SAN Device
Grounding lug kit
Mounting kit
ESD wrist strap
Cables and connectors
Cable management frames
Left and right side frames
Top frame
M4 x 12 mm flat-head Phillips screws (12)
M3X8 mm pan-head screws (2)
Required Equipment
You need to obtain the following items before beginning the installation:
Number 1 and number 2 Phillips screwdrivers with torque capability
3/16-inch flat-blade screwdriver
Tape measure and level
ESD wrist strap or other grounding device
Antistatic mat or antistatic foam
In addition to the grounding items provided in the accessory kit, you need the following items:
54IBM Storage Networking SAN192C-6, SAN384C-6 and SAN768C-6: SAN192C-6, SAN384C-6 and
SAN768C-6 Installation, Service, and User Guide

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM SAN192C-6 and is the answer not in the manual?

IBM SAN192C-6 Specifications

General IconGeneral
BrandIBM
ModelSAN192C-6
CategoryStorage
LanguageEnglish

Related product manuals