v Bottom hole of the fifth EIA (
5
in Figure 3-4 on page 3-7).
b.
In the rear vertical rack rails, rail studs will be positioned as follows:
v Bottom hole of the second EIA (
2
in Figure 3-5 on page 3-7).
v Top hole of the fourth EIA (
4
in Figure 3-5 on page 3-7).
3.
For a 14U library, install clip nuts (
3
in Figure 3-3 on page 3-5) for vertical
rack rails with round holes or cage nuts (
4
in Figure 3-3 on page 3-5) for
vertical rack rails with square holes in the front rack rails in the following
positions:
v Top hole of the tenth EIA
v Top hole of the eleventh EIA
These clip/cage nuts will be positioned to secure the rack ear screws for the
upper unit of a 14U library.
Installing the Rails
Follow these steps to install the Rack Mount Kit rails.
18-32 kg (39.7-70.5 lbs)
svc00167
Important: Because of the weight of a multi-module library, it is strongly
recommended that you install it in the lowest position in a rack. Without
drive sleds and power supplies, a 5U library (control module) weighs
approximately 50 lbs. Without drive sleds and power supplies, a 14U
library (control module + 9U expansion module) weighs approximately 110
lbs.
svc00168
32-55 kg (70.5-121.2 lbs)
3-8 TS3310 Tape Library Setup and Operator Guide