Table 16: Site Preparation Checklist for the SRX210 Services Gateway
Installation (continued)
Date
and
NotesAdditional InformationItem or Task
“SRX210 Services Gateway Rack
Requirements” on page 40
•
Verify that your rack meets the minimum
requirements.
•
Plan rack location, including required space
clearances.
•
Secure the rack to the floor and building
structure.
Cabinet Installation
“SRX210 Services Gateway Cabinet
Requirements” on page 39
•
Verify that your cabinet meets the minimum
requirements.
•
Plan the cabinet location, including required
space clearances.
Wall Installation
“Preparing the SRX210 Services
Gateway for Wall-Mount
Installation” on page 89
•
Verify that the area selected meets the
minimum requirements.
•
Verify that you have the required hardware to
proceed with the installation.
Desktop Installation
“Preparing the SRX210 Services
Gateway for Desk-Mount
Installation” on page 88
•
Verify that the area selected meets the
minimum requirements.
•
Plan the installation location, including
required space clearances and airflow
requirements.
Cables
“Interface Cable and Wire
Specifications for the SRX210
Services Gateway” on page 71
•
Acquire cables and connectors.
•
Review the maximum distance allowed for
each cable. Choose the length of cable based
on the distance between the hardware
components being connected.
•
Plan the cable routing and management.
Related
Documentation
SRX210 Services Gateway Specifications on page 7•
• General Site Guidelines for Installing the SRX210 Services Gateway on page 39
• Installation Overview for the SRX210 Services Gateway on page 77
• SRX210 Services Gateway Cabinet Requirements on page 39
• SRX210 Services Gateway Rack Requirements on page 40
• Clearance Requirements for Airflow and Hardware Maintenance of the SRX210 Services
Gateway on page 41
Copyright © 2012, Juniper Networks, Inc.38
SRX210 Services Gateway Hardware