Description and Operation 4-21
D-I012.1109EN
innovators in agriculture
4.3.2.2 Time Path
It is useful to combine routes into a 'Time path'. If the time path is
switched ON the JUNO 150 drives the set routes automatically at the set
times each day (page 6-12). A time path lasts maximum 24 hours. A time
path has 48 time/route combinations maximum, made up of 16 different
routes maximum.
The display shows the following information:
Display Description
• Time path: start times of set routes
• Route: number of the route.
Buttons:
• [
] or [ ] to select a route in the time path
• Soft button [Del] to delete a timed route from the time path
• Soft button [New] to add a new timed route to the time path
• Soft button [>] to select the next variable.
Example:
• Route 1 - push the forage 2 m from the feed fence
• Route 2 - push the forage 1.8 m from the feed fence
• Route 3 - push the forage 1.6 m from the feed fence
• Route 4 - push the forage 1.4 m from the feed fence.
Note:
Measurements are from the ultrasonic sensor to the feed fence.
The following example time path is based on these routes, with the
assumption that the farmer feeds at 10:00:
Time Route
12:00 1
14:00 1
16:00 1
18:00 2
20:00 2
22:00 2
0:00 3
2:00 3
4:00 4
6:00 4