EasyManua.ls Logo

LELY JUNO 150 - Page 49

LELY JUNO 150
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Description and Operation 4-21
D-I012.1109EN
innovators in agriculture
4.3.2.2 Time Path
It is useful to combine routes into a 'Time path'. If the time path is
switched ON the JUNO 150 drives the set routes automatically at the set
times each day (page 6-12). A time path lasts maximum 24 hours. A time
path has 48 time/route combinations maximum, made up of 16 different
routes maximum.
The display shows the following information:
Display Description
Time path: start times of set routes
Route: number of the route.
Buttons:
[
] or [ ] to select a route in the time path
Soft button [Del] to delete a timed route from the time path
Soft button [New] to add a new timed route to the time path
Soft button [>] to select the next variable.
Example:
Route 1 - push the forage 2 m from the feed fence
Route 2 - push the forage 1.8 m from the feed fence
Route 3 - push the forage 1.6 m from the feed fence
Route 4 - push the forage 1.4 m from the feed fence.
Note:
Measurements are from the ultrasonic sensor to the feed fence.
The following example time path is based on these routes, with the
assumption that the farmer feeds at 10:00:
Time Route
12:00 1
14:00 1
16:00 1
18:00 2
20:00 2
22:00 2
0:00 3
2:00 3
4:00 4
6:00 4

Table of Contents

Other manuals for LELY JUNO 150

Related product manuals