EasyManua.ls Logo

MacDon R216 SP - Chapter 3: Operation; 3.1 Break-In Period

MacDon R216 SP
184 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
214880 19 Revision A
Chapter 3: Operation
3.1 Break-In Period
After attaching the header to the windrower for the first time, operate the machine slowly for 5 minutes, watching and
listening from the operators seat for binding or interfering parts.
NOTE:
Until you become familiar with the sound and feel of your new header, be extra alert and attentive.
CAUTION
Before investigating an unusual sound or attempting to correct a problem, stop the engine, put the ground speed lever
(GSL) in PARK, and remove the key.
NOTE:
Perform the items specified in 4.3.2 Break-In Inspections, page 66.

Table of Contents

Related product manuals