EasyManua.ls Logo

Napoleon Vector Series - All Terminations (Propane) LV74

Napoleon Vector Series
156 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
W415-2034 / A / 10.18.19
EN
24
minimum venting requirements - propane
3.7 all terminations (propane) LV74
0’
0’
Base of
air collar
10’
10’
15’
15’
20’
25’
20’
30’
40’
5’
3 ⅞’
(46 ½”)
4 7/8’
(58”)
1 elbow zone
H
V
38 ½’
(462”)
4 ⅜’
(52 ½”)
1-2 elbow zone
V+H ≤ 40 ft. H ≤ 4⅜ ft.
(For longer vent runs, a power vent is
required).
V + H are measured from the centre of vent
elbows. Elbows are considered as 90º.
Two 45º elbows = One 90º elbow.
For 0 elbow configurations, V is a minimum
of 6’ to a maximum of 40’.
Vertical termination only.
No horizontal termination allowed.
Refer to appliance
specific GPV/PVA
instructions for other
venting configurations.
35’
8 ½’
(102”)
6’
(72”)
1 ½’
(18”)
2 ½’
(30”)
(PROPANE ONLY)

Table of Contents

Other manuals for Napoleon Vector Series

Related product manuals