W415-2034 / A / 10.18.19
EN
4
table of contents
1.0 general information 5
1.1 rates and effi ciencies 6
1.2 installation overview 7
1.3 rating plate/lighting instruction
location 9
1.4 mobile home installation 10
1.5 hardware list 10
1.6 lifting handles installation/removal 10
2.0 dimensions 11
2.1 single-sided 11
2.2 see-thru 12
3.0 minimum venting requirements 13
3.1 typical venting installation 15
3.2 minimum air terminal location
clearances 17
3.3 horizontal termination (natural gas) 18
3.4 vertical termination
(natural gas) 21
3.5 all terminations (propane) LV38-1 22
3.6 all terminations (propane )
LV50-2 / 62 23
3.7 all terminations (propane) LV74 24
4.0 rough framing - before appliance
installation 25
4.1 minimum framing dimensions 26
4.1.1 minimum clearance to combustible
enclosures 27
5.0 venting installation 30
5.1 fi restop spacer assembly 30
5.2 horizontal installation 32
5.3 vertical installation 32
5.4 using fl exible vent components 33
5.4.1 horizontal air terminal installation 33
5.4.2 vertical air terminal installation 34
5.4.3 appliance vent connection 34
5.5 restricting vertical vents 35
5.5.1 LV38-1 / LV50-2 35
5.5.2 LV62 / LV74 35
5.6 vent shield installation 36
6.0 electrical information 37
6.1 hard wiring connection 37
6.2 receptacle wiring diagram 37
6.3 in the event of a power failure 37
6.4 battery holder/switch installation 38
6.5 initializing the battery holder/switch
for the fi rst time 38
6.6 access panel 39
6.7 wiring diagram 40
6.8 eFIRE application controller 40
6.8.1 LV38-1 / LV50-2 wiring diagram 41
6.8.2 LV62 / LV74 wiring diagram 42
7.0 gas installation 43
8.0 operation 44
8.1 pilot-on-demand 45
9.0 nailing tab installation 46
10.0 finish framing - after appliance
installation 47
10.1 framing with non-combustibles 47
11.0 finishing 51
11.1 fastener placement restriction 51
11.2 fi nishing with non-combustibles 52
11.3 installing non-combustible board 54
11.4 minimum combustible mantel
clearances 55
11.5 TV mounting restrictions
(without DHC™) 56
11.6 safety barrier installation / removal 57
11.7 fi rebox glass door installation /
removal 57
11.8 media installation / removal 59
11.9 media tray removal 60
12.0 adjustments 61
12.1 restricting vertical vents 61
12.2 venturi adjustment 61
12.3 pilot burner adjustment 62
12.4 fl ame characteristics 62
13.0 maintenance 63
13.1 annual maintenance 64
13.2 control access 64
13.3 burner removal 65
13.4 valve removal 65
13.5 control module removal 66
13.6 LED replacement 67
13.7 glass / door replacement 68
13.8 care of glass 68
13.9 care of plated parts 68
14.0 replacement parts 69
14.1 overview 70
14.2 burner components 71
15.0 troubleshooting 73
16.0 warranty 76
17.0 notes 77
The information throughout this manual is believed to be correct at the time of printing. Wolf Steel Ltd. reserves
the right to change or modify any information within this manual at any time without notice. Changes, other than
editorial are denoted by a vertical line in the margin.
note: