EasyManua.ls Logo

Nuova Simonelli PRONTOBAR - Semi-Annual Pouring Group Maintenance

Nuova Simonelli PRONTOBAR
176 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.1 SEMI-ANNUAL POURING
GROUP MAINTENANCE
It is recommended that the group has routine
maintenance every 6 months or 25.000 pouring
cycles.
1 Follow the maintenance check list instruc-
tion. Turn the machine off and remove the
grounds drawer and the drip tray. Switch
off the machine at the mains; pressing
and holding both the up and down arrows,
switch on the machine: the display shows
“manual movement”.
2 Remove the front panel by loosening the 4
screws.
3 Slide down the front panel.
4 Remove the front panel from the front.
5 Switch off the machine at the main switch,
press the key up and down arrows, turn on
the machine at the main switch. The display
shows:
MANUAL
MOVEMENT
6 Open the front door.
7 Remove the grounds drawer and tray.
Edition 02 to 02/2014
4.2
SERVICE MANUAL
Fig. 79
00:13
3
2
2
2
2
Fig. 80
00:16
5
5
5
ON/OFF
Fig. 81
00:22
6
7
Fig. 82
00:28

Table of Contents

Other manuals for Nuova Simonelli PRONTOBAR

Related product manuals