4.1 SEMI-ANNUAL POURING
GROUP MAINTENANCE
It is recommended that the group has routine
maintenance every 6 months or 25.000 pouring
cycles.
1 Follow the maintenance check list instruc-
tion. Turn the machine off and remove the
grounds drawer and the drip tray. Switch
off the machine at the mains; pressing
and holding both the up and down arrows,
switch on the machine: the display shows
“manual movement”.
2 Remove the front panel by loosening the 4
screws.
3 Slide down the front panel.
4 Remove the front panel from the front.
5 Switch off the machine at the main switch,
press the key up and down arrows, turn on
the machine at the main switch. The display
shows:
MANUAL
MOVEMENT
6 Open the front door.
7 Remove the grounds drawer and tray.
Edition 02 to 02/2014
4.2
SERVICE MANUAL
Fig. 79
00:13
Fig. 80
00:16
Fig. 81
00:22
Fig. 82
00:28