EasyManua.ls Logo

Nuova Simonelli PRONTOBAR - Annual Pouring Group Maintenance

Nuova Simonelli PRONTOBAR
176 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4.2.1 GROUP REMOVAL AND
CLEANING
1 Unscrew the 4 allen screws and remove the
top cover.
4.2 ANNUAL POURING GROUP
MAINTENANCE
Every year or after 50.000 cycles the group
should be replaced with a new or reconditioned
one.
For reconditioning follow the maintenance check
list directions.
2 Remove the grinder nozzle cups and the pis-
ton of the group.
3 Remove the allen screw 3 mm and the plugs
for the motor and heating element.
4 Then remove pouring group and motor, slid-
ing them from top and opening the grinders
nozzles.
Edition 02 to 02/2014
4.9
SERVICE MANUAL
1 1
11
Fig. 108
03:17
3
Fig. 109
03:23
Fig. 107
4
Fig. 110
03:32

Table of Contents

Other manuals for Nuova Simonelli PRONTOBAR

Related product manuals