4.2.1 GROUP REMOVAL AND
CLEANING
1 Unscrew the 4 allen screws and remove the
top cover.
4.2 ANNUAL POURING GROUP
MAINTENANCE
Every year or after 50.000 cycles the group
should be replaced with a new or reconditioned
one.
For reconditioning follow the maintenance check
list directions.
2 Remove the grinder nozzle cups and the pis-
ton of the group.
3 Remove the allen screw 3 mm and the plugs
for the motor and heating element.
4 Then remove pouring group and motor, slid-
ing them from top and opening the grinders
nozzles.
Edition 02 to 02/2014
4.9
SERVICE MANUAL
Fig. 108
03:17
Fig. 109
03:23
Fig. 107
Fig. 110
03:32