OPERATION GUIDE 2-1
2 Preparation before Use
This chapter explains the preparations before using this
equipment for the first time as well as the procedures for
loading papers and originals.
•
Determining the Connection Method and Preparing Cables
...... 2-3
• Connecting Cables....................................................... 2-5
• Setting Date and Time.................................................. 2-8
• Configuring a Network (LAN Cable Connection)........ 2-10
• Accessing EWS (Embedded Web Server)
and Transmission)...................................................... 2-12
• TCP/IP Settings.......................................................... 2-13
• Sending E-mail........................................................... 2-15
• User Login Administration .......................................... 2-27
• Installing Software ...................................................... 2-30
• Selecting the Default Screen (Optional) ..................... 2-31
• Changing Language (Optional) .................................. 2-33
• Loading Paper............................................................ 2-34
• Loading Originals ....................................................... 2-47