93
Offline Simulation Section 6-4
6-4 Offline Simulation
The operation of the G9SP-series Controller's programming can be checked
by performing simulation on a computer.
Note Simulation cannot be used during online monitoring. Disconnect the online
connection before starting simulation.
6-4-1 Basic Procedure
This section describes the basic procedure for simulation.
Starting Simulation
1,2,3... 1. Check that the G9SP Configurator is offline .
2. Click the Start Simulation Icon . The background of the Program Win-
dow will turn pink.
Executing Simulation
1,2,3... 1. Click the Program Operation Icon .
2. Debug the program by selecting the desired I/O tag and then clicking the
Set Icon , Reset Icon , and Reverse Icon .
Start and stop
simulation.
•Run/stop
•Set/reset/reverse
You can change the values of any input tags to simulate
the operation of the program.
Time Chart
A time chart can be used to check
operation for a previously set input
pattern.