Installation and commissioning
20
Fig. 8 - 02
● Fasten sealing tape reel holder 1 with screws 2.
8.02 Commissioning
● Before commissioning the machine clean it thoroughly, see Chapter 12 Care and Main-
tenance!
● Check the machine, in particular the electric cables and the pneumatic connection tubes,
for any damage.
● Have a qualifi ed person check whether the motor can be driven with the existing power
voltage.
If there are any differences, the machine must defi nitely not be operated!
The machine must only be connected to a suitably earthed socket!
● Connect the machine to the compressed air system. A pressure of 6 bar should be dis-
played on the manometer. If necessary, set this value, see Chapter 12.03 Checking /
adjusting the air pressure.
The air must be completely oilfree and dry.
The compressed air quality infl uences the service life of the heating cartridge
in the air heater. If the air is very damp, a compressed air cold drier with
preliminary fi lter and seccondary fi ne fi lter must be installed in front of the
heat-sealing machine.
8.01.02 Fitting the sealing tape reel holder
1
2
2