Preparation
24
9.01.03 Inserting the sealing tape
The sealing tape should run in the centre of the feed rollers and be guided in a
narrow channel but still run easily through the guide.
● Switch on the machine.
● Loosen knurled nut 1 and adjust guide unit 2 with knurled screw 3.
● Tighten knurled nut 1.
● Cut the sealing tape at a slant and lead it through guide unit 2, until it becomes visible un-
der unit 2.
● Start a cutting operation.
The sealing tape is drawn in and cut.
Danger of injury from the tape knife!
Do not touch the tape cutting device by hand!
Use tweezers!
Fig. 9 - 03
2
1
3