EasyManua.ls Logo

Planet IGS-10020HPT-U - DIN-Rail Mounting

Planet IGS-10020HPT-U
403 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Users Manual of IGS-10020HPT-U
33
2.2.2 DIN-rail Mounting
This section describes how to install the Industrial Managed PoE+ Switch. There are two methods to install the Industrial
Managed PoE+ Switch -- DIN-rail mounting and wall-mount plate mounting. Please read the following topics and perform the
procedures in the order being presented.
Follow all the DIN-rail installation steps as shown in the example.
Step 1: Screw the DIN-rail bracket on the Industrial Managed PoE+ Switch.
Step 2: Lightly slide the DIN-rail bracket into the track.
Step 3: Check whether the DIN-rail bracket is tightly on the track.
Please refer to the following procedures to remove the Industrial Managed PoE+ Switch from the track.
Step 4: Lightly remove the unit from the track.

Table of Contents

Related product manuals