EasyManuals Logo

Planet IGS-10020HPT-U User Manual

Planet IGS-10020HPT-U
403 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #346 background imageLoading...
Page #346 background image
User’s Manual of IGS-10020HPT-U
346
4.6.1.6 Port Sequential
This page allows the user to configure the PoE Ports started up interval time. The PoE Port will start up one by one as Figure
4-6-1-5 shows.
Figure 4-6-1-5: PoE Port Sequential Power Up Interval Configuration Screenshot
The PoE port will start up after the whole system program has finished running.
The page includes the following fields:
Object Description
• Sequential Power up
Option
Allows user to enable or disable Sequential Power up function.
• Sequential Power up
Interval
Allows user to configure the PoE Port Start Up interval time.
• Sequential Power up
Port Option
There are two modes for Starting Up the PoE Port
By Port: The PoE Port will start up by following Port number.
By Priority: The PoE Port will start up by following the PoE Priority.
Buttons
: Click to apply changes
: Click to undo any changes made locally and revert to previously saved values.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Planet IGS-10020HPT-U and is the answer not in the manual?

Planet IGS-10020HPT-U Specifications

General IconGeneral
BrandPlanet
ModelIGS-10020HPT-U
CategorySwitch
LanguageEnglish

Related product manuals