EasyManua.ls Logo

PP Systems TARGAS-1 - Custom - Prepare Chamber (Step 5); Custom - Start Measuring (Step 6)

PP Systems TARGAS-1
159 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TARGAS-1 Operation Manual V. 1.02 94 support@ppsystems.com
Plot Number Button
Change/View plot number. Range: 01000.
Tair Button
Air temperature inside chamber (
o
C).
Stop Button
Stops the Custom process and returns to the Processes Menu.
Right Arrow Button
Continues to the Custom Prepare Chamber screen (Step 5).
Custom – Prepare Chamber (Step 5)
At this stage, the Custom probe should be held in the air to allow it to flush out prior to placing it on the
soil. CO
2
concentration is displayed during this step. Unlike the SRC and CPY Processes, there is no
countdown for flushing the chamber; it is up to the user to determine the amount of time required to flush
a custom chamber. Once the chamber has been adequately flushed, pressing the Start button will allow
the process to continue to the Custom Start Measuring screen (Step 6)
Custom Prepare Chamber Menu
CO2 (ppm)
CO
2
concentration.
Stop Button
Stops the Custom process and returns to the Custom Other Settings menu
(Step 4).
Start Button
Continues to the Custom Start Measuring screen (Step 6). Note: It is up to
the user to determine the amount of time required to flush a custom chamber.
Custom – Start Measuring (Step 6)
At this stage, the Custom probe should be placed on the soil. The number at the top right of the screen (2
in this case) is the count down from 5-0 seconds. CO
2
concentration is displayed during this step. When
completed, the Custom Data Plot screen (Step 7) will be displayed.

Table of Contents

Related product manuals