EasyManua.ls Logo

Putzmeister MP 25 - Operation; Requirements; Emergency Shutdown Procedure; With EMERGENCY STOP Button

Putzmeister MP 25
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.1 Requirements
You must have completed the operations for setting up and starting
up the machine before you begin operating the machine.
Before you fill the machine with material and start pumping it through
the delivery line, you must make sure that:
The machine functions correctly
The delivery line is designed for the specified delivery pressure
The delivery line has been installed properly
If a malfunction occurs during the pumping process, consult the
“Faults, cause and remedy” chapter first. Contact the manufactur‐
er's After Sales department for advice if you are unable to rectify
the fault yourself.
6.2 Emergency shutdown procedure
Make sure you are completely familiar with the procedure for shutting
down the machine in an emergency situation before you start operat‐
ing the machine. Proceed immediately as described below if an emer‐
gency occurs while you are operating the machine.
1. Immediately switch the machine off at the main switch in the
event of an emergency.
2. If necessary, take first-aid measures.
3. Note down the incident and report it in line with company guide‐
lines.
4. Look for the cause of the fault and rectify it or have it rectified.
5. Start the machine up again. See the chapter “Starting up” for
more information.
6.2.1 With EMERGENCY STOP button
Depending on the version and country of use, your machine may be
fitted with an EMERGENCY STOP button.
The EMERGENCY STOP button is fitted to the control cabinet of the
machine.
Operation
6 — 2

Table of Contents