EasyManua.ls Logo

Putzmeister MP 25 - Page 104

Putzmeister MP 25
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Item Designation
1 Control valve for water volume
2 Flow meter
You can adjust the water volume by turning the volume control valve.
This is done by gradually adjusting the water volume in small steps
(20–40 l/h). This can be seen by looking at the float through the in‐
spection glass. This reaches the new value on the scale.
Item Designation
1 Material gate valve
1. Open the material gate valve slowly up to the stop.
Operation
6 — 6

Table of Contents