5 Starting up
This chapter contains information on starting up the machine. It de‐
scribes the work steps required for the initial commissioning of the
machine and how to prepare the machine before use after longer
breaks. There is also a description on how to check the condition of
your machine and how to carry out a test run with function checks.
The operating personnel should be instructed on the machine dur‐
ing the initial commissioning.
For every use of the machine, the operator of the machine accepts
full responsibility for the safety of anyone located in the device's dan‐
ger zone. The operator is therefore under an obligation to ensure the
operational safety of the machine.
After receiving the machine, the operator must familiarise themself
with the machine. This means:
The operator must have read and understood the Operating In‐
structions (particularly the “Safety regulations” chapter).
The operator must implement the correct measures in an emer‐
gency and switch off and secure the machine.
The entire machine must be monitored during the first operating
hours to detect any malfunctions.
5 — 1