INSTALLING HARDWARE INSTALLING A SAS 6G MEZZANINE CARD
2-35
4. Remove nine (9) memory modules.
5. Connect the SAS cables to the ports on the module.
Figure 2-50. 6G SAS Cables and Module Ports
6. Turn the module assembly so that the linking board is fac-
ing the mainboard.
7. Align the linking board with the mainboard connector.
Figure 2-51. 6G Linking Board and Mainboard Connector
8. Connect the linking board to the mainboard connector.