Roche Diagnostics
G-16
Operatorโs Manual ยท Version 3.4
Index Cedex Bio analyzer
ISE results, Cโ35
โ calculation checks, Cโ35
โ calculation of concentration, Cโ35
ISE status, screen, Aโ97
ISE tower, Fโ11
โ cleaning automatically, Fโ54
โ cleaning manually, Fโ55
โ cleaning off the analyzer, Fโ40
ISE unit, Fโ9
โ deactivating, Fโ68
โmain components, Fโ10
โ specifications, Aโ66
K
keyboards, Aโ75
L
laboratory conversion, Cโ28
laboratory correlations, Bโ166
layout of screens, Aโ70
LEDs
โ color table, Aโ126
โ ISE, Fโ10
โoverview, Aโ41
level detection, Aโ49
lids
โISE, Fโ9
โoverview, Aโ39
linear interpolation, Cโ17
linear regression, Cโ18
lists
โ Abs. flags, Eโ28
โ alarm messages, Eโ10
โ expanding and collapsing, Aโ74
โ ISE flags, Fโ75
โ lots, Aโ109
โ orders, Aโ101
loading
โ reagent disk, Bโ23, Eโ50
โ reagents, Bโ28
loadlist, screen, Aโ110
log files, exporting, Bโ120
logging off, Bโ96
logging on, Bโ12
logit/log 4, Cโ19
logit/log 5, Cโ20
logs, alarm messages, Eโ9
lot data, screen, Aโ108
lot list, Aโ109
lots
โ adding, Bโ110
โ defining, Bโ110
โ defining for calibrators, Bโ160
โ defining for controls, Bโ159
โ handling, Bโ106
โ list, Aโ109
โ viewing definitions, Bโ106, Bโ107
โ viewing details of used fluids, Bโ109
lower-case letters, Aโ76
M
main calibration, Fโ12, Fโ28
maintenance
โanalyzer, Dโ5
โ ISE, Fโ43
โoverview, Dโ5
โ screen, Aโ114
maintenance actions
โ Abs. air/water calibration, Dโ26
โ Activate electrodes, Fโ49
โ Clean housing, Dโ20
โ Clean ISE tower automatically, Fโ54
โ Clean ISE tower manually, Fโ55
โClean probe manually, Dโ12
โClean reagent disk, Dโ14
โ Clean rotor and heating channel, Dโ10
โ Clean rotor heating channel, Dโ29
โ Clean water and waste, Dโ16
โ Cleanup database, Dโ21
โ colors of entries, Bโ22
โ Condition ISE tubing, Fโ50
โ Contact service representative, Dโ25
โ Daily prepare actions, Fโ48
โ Deproteinize probe, Dโ10
โ Electrode service, Fโ53
โ Initialize ISE reference sensor, Fโ51
โ Initialize ISE unit, Fโ57
โ intervals, Dโ7
โ intervals for ISE, Fโ45
โperforming, Dโ6
โ performing during End Shift phase, Bโ93
โ performing during Prepare phase, Bโ21
โPrime fluid system, Dโ11
โ Prime ISE calibrator and reference, Fโ52
โ Replace ISE pump tubing, Fโ58
โ Replace ISE unit tubing, Fโ61
โ Replace photometer lamp, Dโ22
โ Replace water inlet filter, Dโ18
maintenance days, Bโ181
manual, how to use, 7
mapping, application codes, Bโ174
mean rate, calculation, Cโ16
measurement principles, Cโ3