EasyManua.ls Logo

Roche Cedex Bio - Page 550

Roche Cedex Bio
558 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
G-16
Operator’s Manual · Version 3.4
Index Cedex Bio analyzer
ISE results, C–35
calculation checks, C–35
calculation of concentration, C–35
ISE status, screen, A97
ISE tower, F–11
cleaning automatically, F–54
cleaning manually, F–55
cleaning off the analyzer, F–40
ISE unit, F9
deactivating, F–68
–main components, F10
specifications, A–66
K
keyboards, A–75
L
laboratory conversion, C–28
laboratory correlations, B–166
layout of screens, A70
LEDs
color table, A–126
ISE, F–10
–overview, A41
level detection, A–49
lids
–ISE, F9
–overview, A39
linear interpolation, C–17
linear regression, C–18
lists
Abs. flags, E–28
alarm messages, E–10
expanding and collapsing, A–74
ISE flags, F–75
lots, A–109
orders, A–101
loading
reagent disk, B–23, E–50
reagents, B–28
loadlist, screen, A110
log files, exporting, B–120
logging off, B–96
logging on, B–12
logit/log 4, C–19
logit/log 5, C–20
logs, alarm messages, E–9
lot data, screen, A–108
lot list, A109
lots
adding, B–110
defining, B–110
defining for calibrators, B–160
defining for controls, B–159
handling, B–106
list, A–109
viewing definitions, B–106, B–107
viewing details of used fluids, B–109
lower-case letters, A–76
M
main calibration, F–12, F–28
maintenance
–analyzer, D5
ISE, F–43
–overview, D5
screen, A–114
maintenance actions
Abs. air/water calibration, D–26
Activate electrodes, F–49
Clean housing, D–20
Clean ISE tower automatically, F–54
Clean ISE tower manually, F–55
–Clean probe manually, D12
–Clean reagent disk, D14
Clean rotor and heating channel, D–10
Clean rotor heating channel, D–29
Clean water and waste, D–16
Cleanup database, D–21
colors of entries, B–22
Condition ISE tubing, F–50
Contact service representative, D–25
Daily prepare actions, F–48
Deproteinize probe, D–10
Electrode service, F–53
Initialize ISE reference sensor, F–51
Initialize ISE unit, F–57
intervals, D–7
intervals for ISE, F–45
–performing, D6
performing during End Shift phase, B–93
performing during Prepare phase, B–21
–Prime fluid system, D11
Prime ISE calibrator and reference, F–52
Replace ISE pump tubing, F–58
Replace ISE unit tubing, F–61
Replace photometer lamp, D–22
Replace water inlet filter, D–18
maintenance days, B–181
manual, how to use, 7
mapping, application codes, B–174
mean rate, calculation, C–16
measurement principles, C–3

Table of Contents

Related product manuals