EasyManua.ls Logo

Roche Cedex Bio - Page 550

Roche Cedex Bio
558 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
G-16
Operator’s Manual · Version 3.4
Index Cedex Bio analyzer
ISE results, C–35
– calculation checks, C–35
– calculation of concentration, C–35
ISE status, screen, A–97
ISE tower, F–11
– cleaning automatically, F–54
– cleaning manually, F–55
– cleaning off the analyzer, F–40
ISE unit, F–9
– deactivating, F–68
–main components, F–10
– specifications, A–66
K
keyboards, A–75
L
laboratory conversion, C–28
laboratory correlations, B–166
layout of screens, A–70
LEDs
– color table, A–126
– ISE, F–10
–overview, A–41
level detection, A–49
lids
–ISE, F–9
–overview, A–39
linear interpolation, C–17
linear regression, C–18
lists
– Abs. flags, E–28
– alarm messages, E–10
– expanding and collapsing, A–74
– ISE flags, F–75
– lots, A–109
– orders, A–101
loading
– reagent disk, B–23, E–50
– reagents, B–28
loadlist, screen, A–110
log files, exporting, B–120
logging off, B–96
logging on, B–12
logit/log 4, C–19
logit/log 5, C–20
logs, alarm messages, E–9
lot data, screen, A–108
lot list, A–109
lots
– adding, B–110
– defining, B–110
– defining for calibrators, B–160
– defining for controls, B–159
– handling, B–106
– list, A–109
– viewing definitions, B–106, B–107
– viewing details of used fluids, B–109
lower-case letters, A–76
M
main calibration, F–12, F–28
maintenance
–analyzer, D–5
– ISE, F–43
–overview, D–5
– screen, A–114
maintenance actions
– Abs. air/water calibration, D–26
– Activate electrodes, F–49
– Clean housing, D–20
– Clean ISE tower automatically, F–54
– Clean ISE tower manually, F–55
–Clean probe manually, D–12
–Clean reagent disk, D–14
– Clean rotor and heating channel, D–10
– Clean rotor heating channel, D–29
– Clean water and waste, D–16
– Cleanup database, D–21
– colors of entries, B–22
– Condition ISE tubing, F–50
– Contact service representative, D–25
– Daily prepare actions, F–48
– Deproteinize probe, D–10
– Electrode service, F–53
– Initialize ISE reference sensor, F–51
– Initialize ISE unit, F–57
– intervals, D–7
– intervals for ISE, F–45
–performing, D–6
– performing during End Shift phase, B–93
– performing during Prepare phase, B–21
–Prime fluid system, D–11
– Prime ISE calibrator and reference, F–52
– Replace ISE pump tubing, F–58
– Replace ISE unit tubing, F–61
– Replace photometer lamp, D–22
– Replace water inlet filter, D–18
maintenance days, B–181
manual, how to use, 7
mapping, application codes, B–174
mean rate, calculation, C–16
measurement principles, C–3

Table of Contents