EasyManua.ls Logo

Roche Cedex Bio - Page 549

Roche Cedex Bio
558 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Roche Diagnostics
Operator’s Manual · Version 3.4 G-15
Cedex Bio analyzer Index
G
global action buttons, A–71
H
handling
– cuvettes, A–55
– lots, B–106
– orders, A–33
– reagents, A–26, A–56
– results, A–34
– samples, A–32
– software data, A–66
hardware
–overview, A–37
– specifications, A–65
heads, transfer, A–48
heating channel, cleaning, D–10
host
– configuration, B–177
– connectivity, A–33
– definitions, B–177
host codes, B–174
– screen, A–118
housing, cleaning, D–20
I
ignoring QC results, B–80
import, screen, A–122
importing
– applications, B–121, B–147
– certificates, B–125
– database, B–123
– extra wash cycles, B–125
– mixing information, B–125
– software, B–123
Initialize ISE reference sensor, maintenance action, F–51
Initialize ISE unit, maintenance action, F–57
installation, safety, A–7
installing
– applications, B–122, B–148
– ISE pump tubing, F–58
– ISE unit tubing, F–65
instrument
–See, analyzer.
intended use
–analyzer, 7
– of operator’s manual, 2
interface
–See, user interface
interfaces, specifications, A–66
internal waste tank, A–50
interpreting, QC History, B–81
Interval QC
– overview, B–74
– performing, B–77
intervals
– ISE maintenance actions, F–45
–maintenance actions, D–7
introduction
– See, overview.
inventory
– checking bottle sets, B–25, B–108
– deleting bottle sets, B–130
– screen, A–121
ISE
–calculation, C–31
– calculation Sol 1 factor, C–32
–calibration, F–12
– calibrator, priming, F–52
– checking status, F–23
– checks, C–31
– cleaning tower automatically, F–54
– cleaning tower manually, F–55
– cleaning tower off the analyzer, F–40
– conditioning tubing, F–50
– flags, F–75
– fluid containers, F–11
– installing pump tubing, F–58
– installing tubing, F–65
– list of flags, F–75
– main calibration, F–28
–maintenance, F–43
– measurement process, F–7
– measuring modes, F–6
– monitoring status, F–26
–operation, F–17
–overview, F–5
– preparing system, F–22
– priming calibrator, F–52
– principles of measurement, F–7
–pump tubing, F–58
– replacing pump tubing, F–58
– replacing tubing, F–61
–sensors, F–11
–solutions, F–8
–standby, F–12
– status, F–73
– test principle, C–32
– tower, F–40, F–54, F–55
–troubleshooting, F–71
– tubing, F–11, F–65
ISE calibration
– slope calculation, C–33
– slope out of range, C–33
– Sol 1 factor, C–34
ISE reference sensor, initializing, F–51

Table of Contents