EasyManua.ls Logo

Santec TSL-710 - Inspection;Calibration; Long-Term Storage; Replacing Fuses

Default Icon
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10-2
TSL-710 Operation Manual
10 - 3 Replacing Fuses
Use two surge resistant type fuses. T1.6A/250V(100~240V). Fuses are in the fuse
box above the power inlet on the rear panel. Pull out the fuse box, and replace with
new fuses.
10 -4 Inspection/Calibration
TSL-710 is warranted for a period of one year. Inspection and calibration on a regular
basis (once every 12 months) is recommended.Please contact our Sales Department
concerning requests for instrument inspection/calibration or consultation on other
matters.
10 -5 Long-term Storage
Before storing the instrument:
1) Make sure the power is shut down completely. (Refer to 5-7 Turning off the unit)
2) Wipe off dust, ngerprints, dirt, stains, etc, from the instrument.
3) Use the packing materials that were originally used to package the instrument.
4) Avoid storing the instrument in the following types of places.
Locations that receive direct sunlight
Locations subject to high temperature or high humidity
Locations where there’s a large amount of dirt, dust, salt content,
or corrosive gas
Locations subject to vibration
Locations where the instrument can be affected by noise from an electric or
magnetic eld,
After cleaning, insert the optical adapter into the optical connector and fix it
securely with 2 screws. If the optical adapter is not attached correctly, optical
output power loss will result.
CAUTION
Damage of the device may be caused by the vibration under transportation if the power
supply is not shut down properly. Make sure the power is shut down completely. (Refer
to 5-7)
Since this instrument is precision measuring equipment, please avoid vibration as much
as possible, and maintain the storage conditions previously specied.
NOTE

Table of Contents

Related product manuals