EasyManua.ls Logo

Santec TSL-710 - Page 34

Default Icon
126 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-18
TSL-710 Operation Manual
If the power supply is shut down under abnormal conditions or due to events
such as power failures while LD is illuminated, turn the power back on (once)
after power distribution is restored, and then turn off the power using the normal
procedure.
Abnormal Operation
If for some reason a fault occurs which prevents the instrument from being switched
off by the normal procedure described above, the instrument can be switched off
by holding the Power On/Off key for at least 10 seconds.
CAUTION
Unplug the power cord from the rear panel to completely shut down power supply.
NOTE

Table of Contents

Related product manuals