EasyManua.ls Logo

Siemens 8DB10 - Page 184

Siemens 8DB10
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
184/214 Revision 06 INSTALLATION AND OPERATING INSTRUCTIONS 8DB10 864-5091.9
Feeder earthing
1
Initial situation
2
Push the selector gate to the left.
3
Push the left-hand control gate to the right.
4
Switch the three-position disconnector to READY-TO-EARTH position
(insert the operating lever for the READY-TO-EARTH function and turn
180° clockwise).

Table of Contents

Related product manuals