Siemens 8DB10 - Procedure for bolted joints and seals

Siemens 8DB10
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Servicing
204/214 Revision 06 INSTALLATION AND OPERATING INSTRUCTIONS 8DB10 864-5091.9
Maintenance
recommendation
44.4 Procedure for bolted joints and seals
Please observe the following procedure for maintenance of switchgear parts with bolted
joints:
Recommendation: Always replace the spring elements on loosened bolted joints.
Please observe the following procedure for maintenance of switchgear parts with seals:
Always replace removed toroidal sealing rings by new ones. Toroidal sealing rings can be
obtained from your regional Siemens representative.
Clean the sealing surfaces and grooves in the flanges with a lint-free cloth.
Check the sealing surfaces before installation.
Grease the toroidal sealing rings and place them in the grooves of the flanges.
If required, place desiccant bags in the cover.
Mount the cover.
Bolt the flanges tight cross-wise with the hexagonal bolts M8 with new spring elements.
Tightening torque: 20 Nm.
DANGER
Danger of suffocation! SF
6
gas is heavier than air and concentrates first near to the floor and in
floor openings.
Do not let SF
6
gas get into the environment.
While working with SF
6
gas, provide for sufficient ventilation.
After working with SF
6
gas, vent the cable basement and any hollows in the floors with
special care.
Observe the safety data sheet for SF
6
gas.
Cover or barrier adjacent live parts.
To be done generally before working with SF
6
gas: Check and document reusability (dew-
point, gas quality) of the SF
6
.
Visual
check
Status
inspection
Maintena
nce
XXXCheck and document SF
6
gas pressure (see page 44, "Insulating gas SF
6
")
XXCheck and document dew-point (humidity content) ( –15° C)
XXCheck and document gas quality (air content) (SF
6
share 95 %)
X Check operating mechanism and interlocking of disconnector and earthing switch
(if required, grease linkage and bearings)
X Vacuum circuit-breaker operating mechanism
X In all gas compartments, if gas has to be exchanged or upon reaching the number of operating cycles:
➭Evacuate SF6 gas.
Replace desiccant bags.
Replace toroidal sealing rings.
Fill in SF
6
gas.
Check and document gas pressure.
Check tightness.

Table of Contents