EasyManua.ls Logo

Siemens 8DB10 - Installation; Constructional stipulations; Switchgear room; Dimensions of the switchgear room

Siemens 8DB10
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
50/214 Revision 06 INSTALLATION AND OPERATING INSTRUCTIONS 8DB10 864-5091.9
Installation
19 Constructional stipulations
19.1 Switchgear room
Please observe the following points while preparing the switchgear room:
Base frame and switchgear dimensions
Transport route to the switchgear room
Distribution and intermediate storage spaces
Size of the room and the doors
Construction and load-bearing capacity of the floor
Illumination, heating, power and water supply
Dimensions of installation scaffoldings and foundation rails
Installation of high-voltage cables
Earthing system
Cleanliness: Switchgear room free of dirt and dust
Floor openings The panels can be bolted or welded to the foundation rails. Fasten each panel diagonally to
the foundation rails at two points at least. Use M10 fixing bolts as a minimum.
Tightening torque: 60 Nm.
Dimensions of the
switchgear room
Fig. 35: Room planning (data in mm)
2850 mm
3)
≥800 mm
Area for floor openings for
control cables
210 mm
2185 mm
2)
Floor openings for high-voltage cables
≥50 mm
1)
1)
500 mm for free-standing
arrangement. 800 mm for
free-standing arrangement and
operation from the rear.
2)
For large panel connection housings
(versions 4 and 5) the dimension must
not be smaller than 2185 mm.
3)
I
f there are any busbar components,
the minimum room height may have
to be higher.

Table of Contents

Related product manuals