EasyManua.ls Logo

Siemens 8DB10 - Page 79

Siemens 8DB10
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
864-5091.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • Revision 06 79/214
Installation
Mounting busbar housing
covers without
desiccant bag holders
For this reason, the busbar housing covers without a holder for desiccant bags are mounted
first (cover without "Filter" inscription).
Remove tools, clean the inside of the housings with a hand vacuum cleaner, and clean
the bushing plates with a rag.
Prepare the flanges of the cleaned busbar housings for assembly.
Clean the contact surfaces of the busbar housing covers with a lint-free paper, and apply a
thin film of grease (e.g. Polylub GLY 801, 0.40 kg).
Put the covers on the prepared flanges and bolt them tight crosswise.
Tightening torque: 20 Nm.
Bolting
the subframes together
The subframes of the transport units are bolted together at the panel joints using connecting
links at the front and a connecting plate at the rear.
Align adjacent connecting links at the subframes. The holes must be in line.
Bolt the transport units together at the front connecting links using four bolts M10 x 20
(tightening torque 40 Nm), and at the rear connecting plate using two coach bolts
M10 x 20 (tightening torque 40 Nm).
ATTENTION
In the ambient air, the desiccant bags lose their effectiveness rapidly and cannot be used
anymore.
Use only desiccant bags whose packing is not damaged and whose humidity indicators in
the packing are blue.
➭Do not use desiccant bags if the humidity indicators are pink.
After opening the packings, mount the desiccant bags in the gas compartment within
30 minutes and close the gas compartment hermetically.
Fig. 75: Bolting the subframe together
(representation with 4MC4 current
transformer)
Connecting plate (rear)
Connecting links (front)

Table of Contents

Related product manuals